A new steel bridge for the Mumbai-Ahmedabad Bullet Train has been launched over NH-3 in Maharashtra. The bridge measures 100 meters long and weighs 1,405 metric tonnes, showcasing advanced construction techniques. It was fabricated in Trichy and transported to its installation site, minimizing traffic disruption. Sixteen out of the planned twenty-eight steel bridges along the rail corridor have now been completed.
Read more at the source
Disclaimer: The content of this post is sourced from external sites and is for informational purposes only. All rights and credits belong to the original authors and publishers.
