Heavy rain triggered by a low-pressure system disrupted road connectivity in Malkangiri district on Saturday, with floodwaters flowing over the Poteru bridge on NH-326, bringing traffic between Malkangiri and Motu to a standstill.
Read more at the source
Disclaimer: The content of this post is sourced from external sites and is for informational purposes only. All rights and credits belong to the original authors and publishers.
