Gurgaon will install 100 rainwater-recharge structures before next monsoon. These structures aim to push 25-30 crore litres of water underground. The plan also includes check dams and camera-based drain monitoring. A survey is underway to divert excess water towards the Yamuna river. These measures aim to significantly improve the city’s waterlogging situation.
Read more at the source
Disclaimer: The content of this post is sourced from external sites and is for informational purposes only. All rights and credits belong to the original authors and publishers.
